top of page

CASE STUDIES

MSW Gasifiers From Our Partners

Varanasi.png

SOUTH ASIA

MSW to Energy Pilot

  • 200 kW

  • 3500 TPY (12 TPD) 

  • Commissioned by local utility

    • Built as a pilot for a mandate to establish waste-to-energy in 200 cities.

  • Operational since 2018

SOUTHEAST ASIA

MSW to Energy Pilot

  • 100 kW

  • Began operations January 2021

phillipines.png
Indonesia_edited.jpg

SOUTHEAST ASIA

Full Scale Facility

  • 8 MW facility

    • 8x 1 MW gasifiers in parallel

  • 120,000 TPY of MSW (400 TPD)

  • Currently in detailed engineering phase

SOUTH AMERICA

Combined Heat and Power Facility

  • 50/50 MSW & biomass input

  • CHP (Combined Heat and Power)

    • 500 kW electricity & 70 kW thermal energy output

    • Learn More

mexico.png
Case Studies: Services
bottom of page